Repair Goose residual landing path after PR #997 diagnostics-only fix #1002

Closed
coilyco-ops wants to merge 2 commits from issue-998 into main
Member

closes #998

ward.workflow: pull-requests-and-merge

This replaces the diagnostics-only PR with a dirty-only Goose landing path and a normal-success fixture that proves the reaper repairs the closing reference before teardown only when the worker never committed.

closes #998 ward.workflow: pull-requests-and-merge This replaces the diagnostics-only PR with a dirty-only Goose landing path and a normal-success fixture that proves the reaper repairs the closing reference before teardown only when the worker never committed.
closes #993
fix(goose): repair dirty-only residual landing
Some checks failed
test / test (pull_request) Failing after 19s
bc64395637
closes #998
Author
Member

verdict: block
confidence: medium
summary: PR #1002 adds the dirty-only Goose residual landing path that ward#998 asked for, including a normal-success fixture, but the live required PR check is red on the current head. I also attempted the focused local Go tests, but this director container's filesystem is full and Go failed during compilation before reaching the tests, so the authoritative blocker is the Forgejo check state.
findings:

  • severity: high
    file: n/a
    line: n/a
    problem: Forgejo reports test / test (pull_request)=failure for head bc64395637c73e85392081f5802c972adae64101, target /coilyco-flight-deck/ward/actions/runs/1610/jobs/0, description Failing after 19s.
    impact: The PR cannot satisfy the issue's green-gate requirement or be safely merged by the director lane while the required test context is red.
    conclusion: The patch appears to target the right missing behavior from ward#998, but the current PR head is blocked on a failing required test check. The next worker should diagnose run 1610, update the branch or replacement PR, and keep the dirty-only landing fixture plus close-reference diagnostics intact.
verdict: block confidence: medium summary: PR #1002 adds the dirty-only Goose residual landing path that ward#998 asked for, including a normal-success fixture, but the live required PR check is red on the current head. I also attempted the focused local Go tests, but this director container's filesystem is full and Go failed during compilation before reaching the tests, so the authoritative blocker is the Forgejo check state. findings: - severity: high file: n/a line: n/a problem: Forgejo reports `test / test (pull_request)=failure` for head `bc64395637c73e85392081f5802c972adae64101`, target `/coilyco-flight-deck/ward/actions/runs/1610/jobs/0`, description `Failing after 19s`. impact: The PR cannot satisfy the issue's green-gate requirement or be safely merged by the director lane while the required test context is red. conclusion: The patch appears to target the right missing behavior from ward#998, but the current PR head is blocked on a failing required test check. The next worker should diagnose run 1610, update the branch or replacement PR, and keep the dirty-only landing fixture plus close-reference diagnostics intact.
coilysiren closed this pull request 2026-07-10 10:07:09 +00:00
Some checks failed
test / test (pull_request) Failing after 19s

Pull request closed

Sign in to join this conversation.
No description provided.