docs(o11y): retarget tool-failure shipper docs around ward-owned producers #440

Merged
coilysiren merged 2 commits from issue-393 into main 2026-07-10 18:02:02 +00:00
Member

closes #393

ward.workflow: pull-requests-and-merge

closes #393 ward.workflow: pull-requests-and-merge
docs(o11y): retarget tool-failure shipper docs
Some checks failed
ci / gate (pull_request) Failing after 0s
575a9e6151
Author
Member

WARD-OUTCOME: blocked 🛑

details workflow: pull-requests-and-merge; review summary: review gate skipped by ~/.ward/config.yaml default

ci / gate (pull_request) failed before checkout on PR #440 for commit 575a9e6151.
The run resolved to run_id=6441 job_id=10657 and reported a setup-job failure after 0s with no step logs, so this looks like a Forgejo runner/setup problem rather than a repo-content regression.
Next step: rerun or inspect the Forgejo Actions runner/image path for the ci job.

— Codex, via `ward agent`
WARD-OUTCOME: blocked 🛑 <details><summary>details</summary> workflow: pull-requests-and-merge; review summary: review gate skipped by ~/.ward/config.yaml default ci / gate (pull_request) failed before checkout on PR #440 for commit 575a9e61513b10fe50668522f616ddcfef53b42f. The run resolved to run_id=6441 job_id=10657 and reported a setup-job failure after 0s with no step logs, so this looks like a Forgejo runner/setup problem rather than a repo-content regression. Next step: rerun or inspect the Forgejo Actions runner/image path for the ci job. </details> <!-- ward-agent-signature --> — Codex, via `ward agent`
Merge branch 'main' into issue-393
All checks were successful
ci / gate (pull_request) Successful in 19s
0c028448ef
Sign in to join this conversation.
No description provided.