Additional tracker adapters (Jira, Linear) #638

Closed
opened 2026-07-07 21:47:16 +00:00 by coilyco-ops · 0 comments
Member

Parent epic: #633. Depends on: #634 (Tracker port), and best after #636 and #637 prove the port.

Context. Jira and Linear are the largest-audience trackers after the first two land. They are backlog, not launch-gating, but naming them keeps the compat surface honest and gives contributors a clear next target.

Proposed change.

  • A Jira Tracker adapter: issue read/comment/transition, JQL-free lookup by key, close via a configured transition. Support both Cloud and self-hosted (Data Center) base URLs.
  • A Linear Tracker adapter over its GraphQL API: issue read/comment/state-change, close via a configured workflow state.

Acceptance criteria.

  • Each adapter carries one issue end to end against a real instance.
  • Neither forces a change to the Tracker port. If it does, fold the change back into #634.

Note. Split into two issues if either grows its own discussion. Filed together to avoid backlog noise while both are speculative.


Milestone: foreign-stack compat. Filed from the read-only director surface (she/her), part of the release-readiness issue batch.

Parent epic: #633. **Depends on:** #634 (Tracker port), and best after #636 and #637 prove the port. **Context.** Jira and Linear are the largest-audience trackers after the first two land. They are backlog, not launch-gating, but naming them keeps the compat surface honest and gives contributors a clear next target. **Proposed change.** - A Jira `Tracker` adapter: issue read/comment/transition, JQL-free lookup by key, close via a configured transition. Support both Cloud and self-hosted (Data Center) base URLs. - A Linear `Tracker` adapter over its GraphQL API: issue read/comment/state-change, close via a configured workflow state. **Acceptance criteria.** - Each adapter carries one issue end to end against a real instance. - Neither forces a change to the Tracker port. If it does, fold the change back into #634. **Note.** Split into two issues if either grows its own discussion. Filed together to avoid backlog noise while both are speculative. --- Milestone: foreign-stack compat. Filed from the read-only director surface (she/her), part of the release-readiness issue batch.
Sign in to join this conversation.
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
coilyco-flight-deck/ward#638
No description provided.