[interactive] Apply projects-root terminal convergence on Windows #644
Labels
No labels
burndown-2026-06
burndown-2026-08
autonomy
async-consult
autonomy
epic
autonomy
headless
autonomy
live-collab
coherence-core
priority
P0
priority
P1
priority
P2
priority
P3
priority
P4
qa-fixture
role/advocate
role/director
role/exec
role/frontend
role/gamedev
role/human
role/platform
role/qa
role/science
role/sysadmin
state
ambient
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set
Reference
coilyco-flight-deck/infrastructure#644
Loading…
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Outcome
Apply and verify the projects-root terminal changes already landed on canonical main:
7418113and follow-up7ce2b9a3ca578a7db49a8Operator verification
windows-envrole so future processes inheritPROJECTS_ROOT=X:/projects.windows-terminal-convergeWard verb.mainworkspace plus new tabs and panes start atX:/projects.X:/projects.Why interactive
The engineer proved the repository behavior locally and pushed all four commits, but the engineer role cannot mutate or verify the live workstation.
The issue needs the
interactivelabel. The connected Forgejo issue surface cannot add labels, and no authenticated browser was available during filing.