CI gate jobs stall while pulling the release image #1175

Closed
opened 2026-08-21 20:12:12 +00:00 by coilyco-ops · 1 comment
Member

Two pull-request CI runs are blocked in the gate job before repository validation starts:

Each log ends at docker pull image=forgejo.coilysiren.me/coilyco-flight-deck/agentic-os:release with no later output. The other PR jobs completed successfully. This needs DevOps investigation of the release-image pull or runner registry path. Related: #1141.

Two pull-request CI runs are blocked in the `gate` job before repository validation starts: * PR #1172, run #3688, job `gate` * PR #1174, run #3689, job `gate` Each log ends at `docker pull image=forgejo.coilysiren.me/coilyco-flight-deck/agentic-os:release` with no later output. The other PR jobs completed successfully. This needs DevOps investigation of the release-image pull or runner registry path. Related: #1141.
Author
Member

Closed in the 2026-08-26 backlog burn-down (coilyco-bridge/agentic-os-kai#901).

Closing as a resolved transient. Both named runs are historical and CI has passed on every merge since, so the release-image pull is not currently stalling the gate. The structural sibling is #1141.

This was priority/P3, the default tier that unsure and unscored issues land in, so it had never been positively judged worth keeping. The 2026-08-26 burn-down ranked the whole P3 pool and cut the bottom. Closed here means not on the list, not wrong or worthless.

If this is live work, reopen it. The whole set is recoverable with state:closed label:burndown-2026-08.

Closed in the 2026-08-26 backlog burn-down (coilyco-bridge/agentic-os-kai#901). Closing as a resolved transient. Both named runs are historical and CI has passed on every merge since, so the release-image pull is not currently stalling the gate. The structural sibling is #1141. This was `priority/P3`, the default tier that unsure and unscored issues land in, so it had never been positively judged worth keeping. The 2026-08-26 burn-down ranked the whole P3 pool and cut the bottom. Closed here means not on the list, not wrong or worthless. If this is live work, reopen it. The whole set is recoverable with `state:closed label:burndown-2026-08`.
coilyco-ops 2026-08-27 03:19:32 +00:00
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
coilyco-flight-deck/agentic-os#1175
No description provided.